Due to the late arrival of the fabric and the need to change the delivery method, Poul confirmed, but the freight difference requires Fang Sheng to communicate with the cloth shop to bear the cost
Due to the late delivery of the fabric and the need to change the shipping method, Poul confirmed, but the freight difference needs Fangsheng to communicate with the cloth line to bear this cost.
Poul confirmed that the fabric needs to be changed when the fabric arrives late, but the freight difference needs Fang Sheng to communicate with the cloth bank to bear the cost<br>