1) The ADN takes the minimum active power loss of the network as theobjective function, and obtains the global optimal solution throughiterative optimizing power flow.2) The MG is still comprehensive optimized based on two goals ofeconomy and environmental protection. When the output of the newenergy unit and load do not match, priority should be given tocharging or discharging by energy storage equipment, and then thereal-time electricity price will decide whether to start the dieselgenerator or to buy electricity from the adjacent MG.3) If there is still a power shortage during the peak power consumptionperiod, the penalty term of the objective function may be infinitedue to the small adjustable capacity inside the MG and the lack ofcorresponding measures for the source-load interaction.