1. Identify the contract HSE requirements for the owner's documents<br>1) general HSE terms and Appendix D special HSE terms in the contract<br>2)Construction Safety Manual<br>2. According to the above relevant terms, there are 31 differences in total, and 11 have been closed. See gap analysis table for details<br>3. According to the audit of HSE baseline assessment, MDR found 17 problems in total, which have been rectified and closed<br>
正在翻译中..