ESD - Currently not full error proof to detect poor connected ESD strip to working mode.No ESD checkpoints in production floor except for some dedicated areas. Need to ensure ESD effectiveness since there is a program in ESDObservation:1. Need to address the lR reflow topic and also usage of auto mould instead of manual mold to avoid long PCN approval2. Cpk for safe launch with good sampled volume must be demonstrated.