I confirmed the progress from now on to the MJ that I planned to transfer to the MCC electric machine from the general trial to the MJ the day before, and the MJ will complete the barrack evaluation in mid July. If you complete the barrack, please<br>I would like to share the materials of EMI motor design, design examination, Barrack machine test data, and other machine information and motor drawings.<br>Please save the above materials below.<br>T: information technology information motor work information new product c1g112<br>
正在翻译中..