Follow-up action after customer confirmationa. Inform factory to start the encoder installationb. Order the speed limiting devicec. Co-operate with JV for preparing VSD starter panel with the Star-delta backup feature for the ventilation fansd. Integrate the speed limiting function to the PLC circuit.e. Prepare two spare fans with motors (one per each ventilation fan type)