The basic profile of gravity dam refers to the triangle profile that t的简体中文翻译

The basic profile of gravity dam re

The basic profile of gravity dam refers to the triangle profile that the dam body meets the stability and strength requirements under the three main loads of self weight, hydrostatic pressure (water level is flush with the dam crest) and pressure rise. Minimum workload. Under the conditions of known dam height h, water pressure P, shear strength parameters F, C and uplift pressure U, according to the requirements of anti sliding stability and strength, the minimum triangular section size of the project can be obtained.According to the engineering experience, the slope of the upstream dam is generally n = 0-0.2, usually vertical, or the upper part is vertical, and the lower part is inclined to the upstream. The slope of the downstream dam is m = 0.6-0.8; the bottom width is about 0.7-0.9 times the dam height.According to the requirements of traffic and operation management, the dam crest shall have sufficient width. In order to prevent waves from crossing the dam crest romantically, a certain superelevation should be kept above the static water level.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
重力坝的基本轮廓是指在自重,静水压力(水位与坝顶齐平)和压力上升这三个主要载荷下,坝体满足稳定性和强度要求的三角形轮廓。最小的工作量。在已知坝高h,水压P,抗剪强度参数F,C和上浮压力U的条件下,根据抗滑移稳定性和强度的要求,可以获得该项目的最小三角形截面尺寸。<br><br><br><br>根据工程经验,上游水坝的坡度一般为n = 0-0.2,通常是垂直的,或者上部是垂直的,下部是向上游倾斜的。下游坝的坡度为m = 0.6-0.8;底部宽度大约是坝高的0.7-0.9倍。<br><br><br><br>根据交通和运营管理的要求,坝顶应有足够的宽度。为了防止波浪浪漫地穿越坝顶,应在静态水位上方保持一定的超高。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
The basic profile of gravity dam refers to the triangle profile that the dam body meets the stability and strength requirements under the three main loads of self weight, hydrostatic pressure (water level is flush with the dam crest) and pressure rise. Minimum workload. Under the conditions of known dam height h, water pressure P, shear strength parameters F, C and uplift pressure U, according to the requirements of anti sliding stability and strength, the minimum triangular section size of the project can be obtained.<br><br><br><br>According to the engineering experience, the slope of the upstream dam is generally n = 0-0.2, usually vertical, or the upper part is vertical, and the lower part is inclined to the upstream. The slope of the downstream dam is m = 0.6-0.8; the bottom width is about 0.7-0.9 times the dam height.<br><br><br><br>According to the requirements of traffic and operation management, the dam crest shall have sufficient width. In order to prevent waves from crossing the dam crest romantically, a certain superelevation should be kept above the static water level.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
重力坝基本剖面是指在自重、静水压力(水位与坝顶齐平)、压力上升三种主要荷载作用下,坝体满足稳定和强度要求的三角形剖面。最小工作量。在已知坝高h、水压P、抗剪强度参数F、C和扬压力U的条件下,根据抗滑稳定和抗滑强度的要求,得到工程最小三角形截面尺寸。<br>根据工程经验,上游坝坡一般为n=0-0.2,一般垂直,或上部垂直,下部向上游倾斜。下游坝坡m=0.6-0.8,底宽约为坝高的0.7-0.9倍。<br>根据交通和运营管理的要求,坝顶应有足够的宽度。为了防止波浪浪漫地越过坝顶,应在静止水位以上保持一定的超高。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.