The dredger is a non-self-sailing ship, dredge capacity 4.500m3/h, tra的简体中文翻译

The dredger is a non-self-sailing s

The dredger is a non-self-sailing ship, dredge capacity 4.500m3/h, transferring distance 8~10km, dredge depth 33m. Box type shape, steel welded, partly double bottom, single deck, combined framed, two steel piles fitted at after ship for positioning and movement. Self-suction pipe is located at centre line and transferring pipe located at port side. Pump room located in front of accommodation and equipped with two dredger pumps, two dredger pumps dedicated driven by two diesel engines and gearbox which located in Engine room. Two wire winches located at middle ship in front of accommodation for ship transverse movement during production, two steel piles located at after ship for ship positioning and Forward / backward movement, one movement is 6m. Double bottom and side ballast tanks, middle ship accommodation, machinery space located under the accommodation, 3 deck cranes located in F/M/A, one after anchor, two transverse anchors located in forward.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
挖泥船是一个非自帆船,疏通容量4.500立方米/ h时,传送距离为8〜10公里,疏通深度33米。<br>箱型的形状,钢板焊接,部分双层底,单甲板,组合成帧,在装配船用于定位和移动后两个钢桩。<br>自吸入管位于中心线与位于口侧传送管。位于的住宿前面和配备有两个泵挖泥船泵室中,两个泵挖泥船专用由两个柴油发动机和齿轮箱,其位于发动机室驱动。<br>位于中间船的在生产过程中船的横向运动的住宿前方两个绞车,两个钢桩位于船后船定位和<br>向前/向后运动,一个动作为6M。双层底和侧压载舱,中间船场所,位于容纳下机械的空间,位于F / M / A,一个锚定后3台甲板起重机,位于前方的两个横向锚。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
The dredger is a non-self-sailing ship, dredge capacity 4.500m3/h, transferring distance 8~10km, dredge depth 33m. <br>Box type shape, steel welded, partly double bottom, single deck, combined framed, two steel piles fitted at after ship for positioning and movement. <br>Self-suction pipe is located at centre line and transferring pipe located at port side. Pump room located in front of accommodation and equipped with two dredger pumps, two dredger pumps dedicated driven by two diesel engines and gearbox which located in Engine room. <br>Two wire winches located at middle ship in front of accommodation for ship transverse movement during production, two steel piles located at after ship for ship positioning and <br>Forward / backward movement, one movement is 6m. Double bottom and side ballast tanks, middle ship accommodation, machinery space located under the accommodation, 3 deck cranes located in F/M/A, one after anchor, two transverse anchors located in forward.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
挖泥船为非自航船舶,挖泥能力4.500m3/h,转运距离8~10km,挖泥深度33m。<br>箱形,钢焊接,部分双层底,单层,组合框架,两个钢桩安装在船尾用于定位和移动。<br>自吸管位于中心线,输送管位于左舷。泵房位于住舱前方,配备两台挖泥泵、两台柴油机专用挖泥泵和位于机舱内的齿轮箱。<br>两台钢丝绞车,位于生产过程中船舶横向移动的舱室前面的中间船舶上,两个钢桩,位于船舶定位的后面船舶上,以及<br>向前/向后移动,一次移动6m。双底侧压载舱,中间船舶舱室,舱室下方的机械空间,F/M/A中的3台甲板起重机,一个后锚,两个横向锚位于前方。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: