b. The cell’s takt time is the rate at which the cell must produce uni的简体中文翻译

b. The cell’s takt time is the rate

b. The cell’s takt time is the rate at which the cell must produce units to match demand.Daily Demand = [11,000 + 2,200] pieces per week4 /5 working days per week = 640 pieces per day Daily Availability = (7 hours per day) * (3,600 seconds per hour) = 25,200 seconds per dayTakt Time = Daily Availability/Daily Demand = (25,200 seconds per day)/640 pieces per day = 39.375 seconds per piecec. The production lead time (in days) is calculated by summing the inventory held between each processing step divided by daily demand.Raw Material lead time = 5.0 daysWIP lead time between Press and Pierce & Form = (2,250/640) = 3.5 daysWIP lead time between Pierce & Form and Finish Grind = (3,350/640) = 5.2 daysWIP lead time between Finish Grind and Shipping = (1,475/640) = 2.3 daysTotal Production Lead time = (5 + 3.5 + 5.2 + 2.3) = 16 daysd. The cycle time at each process is added to compute total processing time. The manufacturing cell’s total processing time is (12 + 34 + 35) = 81 seconds.e. The cell’s capacity may be calculated by locating the bottleneck and computing the number of units that it can process in the available time per day at that bottleneck with the given batch size of 40 units
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
湾 该电池的生产节拍时间是在该小区必须出示单位以满足需求的速度。<br>每日需求= [11000 + 2200]每week4件每周每天= 640个/ 5个工作日内<br>每日可用性=(每天7小时)*(每小时3600秒)=每天25200秒<br>节拍时间=每日可用性/每日需求=(每天25200秒)/每天每一块=39.375秒640件<br>下进行。生产前置时间(天数)是通过对每一个加工步骤通过日常需求之间划分持有存货的计算。<br>原料铅时间=5.0天<br>WIP新闻和皮尔斯表=(2250/640)= 3.5天交货时间<br>WIP皮尔斯形式和精磨=(3,350 / 640)= 5.2Hz天交货时间<br>(1475/640)精磨和运输=之间WIP前置时间=2.3天<br>总生产准备时间=(5 + 3.5 + 5.2 + 2.3)=16天<br>天。在每个工艺周期时间被添加到计算总的处理时间。制造单元的总处理时间是(12 + 34 + 35)= 81秒。<br>即 电池的容量可以通过定位瓶颈和计算的单元的数目,它可在与40个单位的给定批次大小瓶颈在每天的可用时间处理来计算
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
b. 细胞的节拍时间是细胞必须产生单位以匹配需求的速率。<br>每日需求 = [11,000 + 2,200] 每周4 / 每周 5 个工作日 = 每天 640 件<br>每日可用性 = (每天 7 小时) = (每小时 3,600 秒) = 每天 25,200 秒<br>节拍时间 = 每日可用性/每日需求 = (每天 25,200 秒)/每天 640 件 = 每件 39.375 秒<br>c. 生产提前期(以天计)的计算方法是,每个处理步骤之间持有的库存除以每日需求。<br>原材料提前期 = 5.0 天<br>新闻和冲孔之间的 WIP 提前期 = 表格 = (2,250/640) = 3.5 天<br>穿刺和完成磨削之间的 WIP 提前期 = (3,350/640) = 5.2 天<br>完成磨削和装运之间的 WIP 提前期 = (1,475/640) = 2.3 天<br>总生产提前期 = (5 + 3.5 + 5.2 + 2.3) = 16 天<br>d. 添加每个进程的循环时间以计算总处理时间。制造单元的总处理时间是(12 × 34 + 35) = 81 秒。<br>e. 可通过定位瓶颈并计算该瓶颈在给定批次大小为 40 个单位的瓶颈时,每天可在该瓶颈的可用时间内处理的单元数来计算该单元的容量
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
b、 单元的节拍时间是单元必须生产单元以满足需求的速率。<br>日需求量=[11000+2200]件/周4/5个工作日=640件/天<br>每日可用性=(每天7小时)*(每小时3600秒)=每天25200秒<br>节拍时间=每日可用性/每日需求=(25200秒/天)/640件/天=39.375秒/件<br>c、 生产提前期(以天为单位)是通过将每个处理步骤之间的库存除以每日需求来计算的。<br>原材料交货期=5.0天<br>冲压和穿孔之间的在制品提前期&Form=(2250/640)=3.5天<br>穿孔、成形和精磨之间的WIP交货期=(3350/640)=5.2天<br>精磨和装运之间的WIP交货期=(1475/640)=2.3天<br>总生产提前期=(5+3.5+5.2+2.3)=16天<br>d、 将每个进程的周期时间相加以计算总处理时间。制造单元的总处理时间为(12+34+35)=81秒。<br>e、 该单元的容量可以通过定位瓶颈并计算在给定批量大小为40个单元的瓶颈处每天可用时间内可以处理的单元数来计算
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.