1. Redefine the requirements of wiring, conduct self inspection after the completion of production wiring, and check the terminal pullback to make sure that the wiring is reliable.<br>2. The quality control group of the general assembly workshop shall form training materials according to the problem point, and arrange training and education for the production line plug-in post.<br>
正在翻译中..