夏季高温施工措施⑴夏季施工要点①检查是否测温仪器设备和测温记录表格忆备好,是否对气温、各项原材料温度进行了测量和记录。②核对各项温度指标是否的英语翻译

夏季高温施工措施⑴夏季施工要点①检查是否测温仪器设备和测温记录表格忆备

夏季高温施工措施⑴夏季施工要点①检查是否测温仪器设备和测温记录表格忆备好,是否对气温、各项原材料温度进行了测量和记录。②核对各项温度指标是否超过规定界限值,超过时有没有采取可行而有效的降温措施。若未采取降温措施,或措施没有持续有效性,应停止施工或改在夜间施工。③检查是否有预留测温孔的方案和相应的用品、混凝土养护的水、覆盖物、抽水机具等是否备齐,能否保证持续养护;事先不具备养护条件不得开盘。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
High-temperature construction measures in summer <br>⑴ Key points of summer construction <br>① Check whether temperature measurement equipment and temperature measurement record forms are in place, and whether the temperature of the air temperature and the temperature of various raw materials have been measured and recorded. <br>② Check whether each temperature indicator exceeds the specified limit value, and whether feasible and effective cooling measures are taken when exceeding. If cooling measures are not taken or the measures are not continuously effective, construction should be stopped or carried out at night. <br>③ Check whether there is a plan to reserve temperature measuring holes and whether the corresponding supplies, water for concrete curing, coverings, pumping equipment, etc. are available, and whether continuous maintenance can be guaranteed; no opening is allowed without maintenance conditions in advance.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
High temperature construction measures in summer<br>⑴ Key points of summer construction<br>① Check if the temperature measuring instruments, equipment, and temperature measurement record forms are well prepared, and whether the temperature and various raw material temperatures have been measured and recorded.<br>② Check whether all temperature indicators exceed the specified limit values, and if feasible and effective cooling measures have been taken when exceeding them. If no cooling measures are taken or if the measures are not continuously effective, construction should be stopped or changed to night time.<br>③ Check if there is a plan for reserving temperature measurement holes and corresponding supplies, whether water, covers, and pumping equipment for concrete curing are ready, and whether continuous curing can be ensured; Do not open without prior maintenance conditions.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
High temperature construction measures in summer<br> (1) Key points of summer construction<br> (1) check whether the temperature measuring instruments and equipment and the temperature measuring record form are well remembered, and whether the temperature and the temperature of various raw materials are measured and recorded.<br> (2) check whether each temperature index exceeds the specified limit value, and whether feasible and effective cooling measures have been taken when it exceeds. If the cooling measures are not taken, or the measures are not effective continuously, the construction should be stopped or changed to night construction.<br> (3) check whether there is a reserved thermometer hole scheme and corresponding supplies, concrete curing water, mulch, pumping equipment, etc. are ready, and whether continuous maintenance can be guaranteed; Do not have the maintenance conditions in advance may not open.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: