The SCH procedure shall follow 6.2.2.3.1.The SC procedure shall follow 6.2. All discharge tests shall be terminated at the supplier's discharge voltage limits. After discharge, the DUT shall rest at least for 30 min or shall be thermally equilibrated at the required ambient temperature or a fixed time period shall be used to allow for thermal equilibration before starting the next step in the test sequence. 7.1.2.2 High-energy battery pack and system The test shall be performed at RT with the discharge rates C/3, 1C, 2C (if 2C is less than Id,max) and the maximum C rate as permitted by the supplier. The test sequence shall be performed as specified in Table 2.