The wells and targets mentioned in the email are based on preliminary geological results (only tectonic maps, no geological models, 2015), combined with dynamic analysis of a preliminary plan. Due to the tight time in the early period and limited understanding of the block, there is still a lot of work to be done to further improve the well level, including the specific well position of the target layer, target coordinates, the old well number to be used, drilling trajectory, etc. need to be further demonstrated and optimized.<br>The project team is actively promoting basic research and has completed tectonic interpretation, strat formation comparison, logging interpretation, etc., and is conducting structural modelling (details of which can be found in the Bi-Weekly Report). In the process of modeling, some problems, such as oil and water contradictions, are being combined with seismic properties for reservoir connectivity analysis.<br>There are some differences between the results of the current stage and the previous results collected, so it is necessary to carry out research on the design of the oil storage engineering scheme on the basis of the completion of geological modeling and numerical simulation, and then carry out the optimization design of concrete and implementable wells and measure wells. At the same time hope to get the assistance of experts on the spot, and work together to complete the relevant work.<br>The work schedule is as follows: 2020.9 Complete geological modeling and reserve calculation.<br> 2020.11 Completion of numerical simulation and oil storage engineering design.<br> 2020.12 Completion of the well level design.
正在翻译中..