邮件中提到的井位及靶点是基于前期地质成果(只有构造图,无地质模型,2015年),结合动态分析做出的一个初步规划。由于前期时间紧,对区块认识程的英语翻译

邮件中提到的井位及靶点是基于前期地质成果(只有构造图,无地质模型,20

邮件中提到的井位及靶点是基于前期地质成果(只有构造图,无地质模型,2015年),结合动态分析做出的一个初步规划。由于前期时间紧,对区块认识程度有限,井位的论证仍有很多工作需要进一步完善,包括目的层的具体井位、靶点坐标、需要利用的老井井号、钻井轨迹等都需要进一步论证优化。项目组正在积极推进基础研究工作,目前已完成构造解释、地层对比、测井解释等工作,正在开展构造建模(具体进展可查阅双周报)。在建模过程中遇到了一些问题,例如油水矛盾等,正在结合地震属性进行储层连通性分析。目前的阶段成果与收集到的前期成果相比存在一定的差异,因此需要在完成地质建模和数值模拟基础上,开展油藏工程方案设计研究,再进行具体的可实施的井位及措施井的优化设计。同时希望得到现场专家的协助,共同完成相关工作。工作进度安排如下:2020.9 完成地质建模及储量计算 2020.11 完成数值模拟及油藏工程方案设计 2020.12 完成井位设计
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The well locations and targets mentioned in the email are a preliminary plan based on the previous geological results (only structural map, no geological model, 2015) and combined with dynamic analysis. Due to the tight early time and limited understanding of the block, there is still a lot of work to be improved on the well location demonstration, including the specific well location of the target layer, target coordinates, old well numbers to be used, and drilling trajectories. Demonstration optimization. <br>The project team is actively advancing basic research work. At present, it has completed structural interpretation, stratigraphic comparison, and logging interpretation, and is carrying out structural modeling (for specific progress, please refer to the bi-weekly report). Some problems were encountered in the modeling process, such as oil-water contradiction, etc., and seismic attributes are being used for reservoir connectivity analysis. <br>There is a certain difference between the current stage results and the collected previous results. Therefore, it is necessary to carry out the design and research of the reservoir engineering scheme based on the completion of geological modeling and numerical simulation, and then carry out the specific implementable well positions and measures. Optimized design. At the same time, we hope to get the assistance of on-site experts to complete related work together. <br>The work schedule is as follows: 2020.9 Completion of geological modeling and reserves calculation <br>2020.11 Completion of numerical simulation and reservoir engineering scheme design <br>2020.12 Completion of well location design
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The wells and targets mentioned in the email are based on preliminary geological results (only tectonic maps, no geological models, 2015), combined with dynamic analysis of a preliminary plan. Due to the tight time in the early period and limited understanding of the block, there is still a lot of work to be done to further improve the well level, including the specific well position of the target layer, target coordinates, the old well number to be used, drilling trajectory, etc. need to be further demonstrated and optimized.<br>The project team is actively promoting basic research and has completed tectonic interpretation, strat formation comparison, logging interpretation, etc., and is conducting structural modelling (details of which can be found in the Bi-Weekly Report). In the process of modeling, some problems, such as oil and water contradictions, are being combined with seismic properties for reservoir connectivity analysis.<br>There are some differences between the results of the current stage and the previous results collected, so it is necessary to carry out research on the design of the oil storage engineering scheme on the basis of the completion of geological modeling and numerical simulation, and then carry out the optimization design of concrete and implementable wells and measure wells. At the same time hope to get the assistance of experts on the spot, and work together to complete the relevant work.<br>The work schedule is as follows: 2020.9 Complete geological modeling and reserve calculation.<br> 2020.11 Completion of numerical simulation and oil storage engineering design.<br> 2020.12 Completion of the well level design.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The well location and target mentioned in the email is a preliminary plan based on the previous geological results (only structural map, no geological model, 2015) combined with dynamic analysis. Due to the tight time in the early stage and limited understanding of the block, there is still a lot of work to be further improved, including the specific well location of the target layer, target point coordinates, the old well number to be used, and the drilling trajectory.<br>The project team is actively promoting the basic research work, and has completed the structural interpretation, stratigraphic correlation, logging interpretation and other work, and is carrying out structural modeling (for specific progress, please refer to the biweekly report). In the process of modeling, some problems have been encountered, such as oil-water contradiction, etc. reservoir connectivity analysis is being carried out combined with seismic attributes.<br>There are some differences between the current stage results and the previous results collected. Therefore, it is necessary to carry out reservoir engineering scheme design research on the basis of geological modeling and numerical simulation, and then carry out the specific feasible well location and measure well optimization design. At the same time, we hope to get the help of experts on site to complete the relevant work.<br>The work schedule is as follows: Geological Modeling and reserve calculation will be completed in September 2020<br>Complete numerical simulation and reservoir engineering scheme design on November 2020<br>Completion of well location design on December 2020<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: