Please arrange to verify production line 5, if there is no problem, please arrange production line Heavy (Heavy scrap costs need to be considered to give HP)
Please arrange the production line to verify 5 units first, if there is no problem, please arrange the production line heavy industry (heavy duty scrap costs need to be calculated to HP)
Please arrange the production line to verify 5 sets first. If there is no problem, please arrange the production line rework (the rework scrap cost needs to be calculated to HP)