The pipe rack modules and nodes are to be fabricated off site to the largest practical size to minimise the work on site. Some expansion loops may be contained within the modules; there will be steam traps installed on the low points of the steam lines outside the modules. All piping branches and lines to process areas will be confined to the nodes to minimise onsite work.