Observe the verticality of the columns with a theodolite, and measure the spacing between adjacent columns with a steel ruler until it meets the design requirements. <br>When the pole position and pole distance meet the requirements, tighten the anchor bolts and nuts while keeping the column vertical, and lock them. <br>After the steel columns are assembled, please hoist them one by one according to the construction specifications and beam installation and construction process requirements.
正在翻译中..