页岩气水平井固井面临三大技术难题:①大型体积压裂对水泥环及井筒密封性能要求高;②高密度油基钻井液条件下提高冲洗顶替效率难度大;③长水平段下套的英语翻译

页岩气水平井固井面临三大技术难题:①大型体积压裂对水泥环及井筒密封性能

页岩气水平井固井面临三大技术难题:①大型体积压裂对水泥环及井筒密封性能要求高;②高密度油基钻井液条件下提高冲洗顶替效率难度大;③长水平段下套管及保证套管居中难度大。通过攻关提出了保证水泥环密封性的力学性能指标,开发出了满足压裂条件下的高强度韧性水泥及高效驱油前置液体系,形成了页岩气水平井固井成套技术,有效保证了固井质量及水泥环密封性能。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Shale gas horizontal well cementing faces three major technical problems: ① Large volume fracturing requires high sealing performance of the cement ring and wellbore; ② It is difficult to improve the flushing displacement efficiency under the condition of high-density oil-based drilling fluid; ③ Long horizontal section casing It is difficult to center the pipe and ensure the casing. Through tackling key problems, the mechanical performance indicators to ensure the sealing of the cement ring have been put forward, and the high-strength and toughness cement and the high-efficiency flooding prefluid system that meet the fracturing conditions have been developed, forming a complete set of shale gas horizontal well cementing technology, effectively guaranteeing Improve cementing quality and cement ring sealing performance.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Shale gas horizontal well cementing wells face three major technical problems: (1) large-scale body backlog cracking on the cement ring and wellhead sealing performance requirements are high; Through the research, the mechanical performance index to ensure the sealing of cement ring is put forward, the system of high-strength toughness cement and high-efficiency oil-repellent pre-liquid under fracturing conditions is developed, and the shale gas horizontal well cementing complete set of technology is formed, which effectively guarantees the cementing quality and cement ring sealing performance.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
There are three technical difficulties in cementing shale gas horizontal wells: 1) large volume fracturing requires high sealing performance of cement sheath and wellbore; 2) it is difficult to improve flushing displacement efficiency under high density oil-based drilling fluid; 3) it is difficult to run casing in long horizontal section and ensure casing centering. Through tackling key problems, the mechanical performance index to ensure the sealing performance of cement sheath is put forward. High strength and toughness cement and high-efficiency oil displacement pre fluid system are developed to meet the fracturing conditions. A complete set of cementing technology for shale gas horizontal wells is formed, which effectively ensures the cementing quality and sealing performance of cement sheath.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: