Shale gas horizontal well cementing faces three major technical problems: ① Large volume fracturing requires high sealing performance of the cement ring and wellbore; ② It is difficult to improve the flushing displacement efficiency under the condition of high-density oil-based drilling fluid; ③ Long horizontal section casing It is difficult to center the pipe and ensure the casing. Through tackling key problems, the mechanical performance indicators to ensure the sealing of the cement ring have been put forward, and the high-strength and toughness cement and the high-efficiency flooding prefluid system that meet the fracturing conditions have been developed, forming a complete set of shale gas horizontal well cementing technology, effectively guaranteeing Improve cementing quality and cement ring sealing performance.
正在翻译中..