No need to perform this test (the water generation system is new) since it has been tested for water quality at sample site SPV-13, and testing would provide very little to no added value since other sampling points at further purification stages will capture the quality output.Risk control: The sampling activities and frequency shall be done in routine sampling phase (e.g., sample randomization in order to ensure that the sample output remains consistently within specifications during routine monitoring).