After the casting belt in the beam, plate steel constantly open, concrete mixing into the mold casting, must be vibration dense, and can fully fill every corner of the formwork, vibration to the concrete does not sink so far, because it is winter construction, vibration to fast, not arbitrary delay vibration time.