Hello! The charge was not repeated. According to the PI3 contract, b04.7 reminded this group of shelves to have this accessory, so that the master would drill holes in the shelf. Therefore, it must be displayed on the b01.20 shelf. I know that the Pi1 contract has been done, and it is not necessary to do it again this time.<BR>
正在翻译中..