汇总6月AUDIT问题,列出重点控制和改进项目,形成7月份AUDIT降分计划管线走向、固定优化提升,全力答应管线攻坚战优化上车踏梯扶手结构,的英语翻译

汇总6月AUDIT问题,列出重点控制和改进项目,形成7月份AUDIT降

汇总6月AUDIT问题,列出重点控制和改进项目,形成7月份AUDIT降分计划管线走向、固定优化提升,全力答应管线攻坚战优化上车踏梯扶手结构,彻底解决扶手使用卡手问题建立设计问题改进计划,优先采取有效的临时措施进行降分。制定终检区域5大问题改进计划下周冉总将和白克非、耿超及沈艳利到终检调试区域检查调试质量问题的遗漏情况,需总装厂对调试区域提升的措施进行展示。在7月份开始AUDIT降分计划中选择问题通过团队协作,根本原因分析和在问题现场进行分析来解决问题1、 接下来的工作重点应放在如何有效的从工装卡具方面的改善来快速有效的解决问题。2、 需要与AUDIT及入厂质量检验科共同讨论保险杠与大灯间隙不均问题该如何定义。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Summarize the June AUDIT problems, list the key control and improvement projects, form the July AUDIT down-score plan <br>pipeline direction, fix optimization and upgrade, fully promise the pipeline to attack and <br>optimize the handrail structure of the landing ladder, completely solve the problem of the use of handrails and <br>design problems Improve the plan and give priority to effective temporary measures to reduce points. <br>Formulate improvement plans for the five major issues in the final inspection area. <br>Next week, General Ran and Bai Kefei, Geng Chao, and Shen Yanli will go to the final inspection and commissioning area to check for missing quality problems. The assembly plant needs to demonstrate the measures to improve the commissioning area. <br>Starting in July, select the problem in the AUDIT score reduction plan to solve the problem through teamwork, root cause analysis and analysis on the problem site <br>1. The next work should focus on how to effectively improve the tooling and fixtures to quickly and effectively Problem-solving. <br>2. It is necessary to discuss with the AUDIT and incoming quality inspection department how to define the gap between the bumper and the headlight.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Summarize the June AUDIT issues, list key control and improvement projects, and form the Audit de-scoring plan for July<br>Pipeline trend, fixed optimization promotion, full commitment to pipeline battle<br>Optimize the structure of the handrails on the boarding ladder and solve the problem of using the handper of the handrest<br>Establish a design improvement plan, giving priority to effective interim measures for de-scoring.<br>Develop a plan for improvement of the top 5 problems in the final inspection area<br>Next week, Ran will be and Bai Kefei, Geng Chao and Shen Yanli to the final inspection commissioning area to check the quality of the omission of commissioning quality, the assembly plant to the commissioning area to improve the measures to show.<br>Select ingons in the AUDIT de-scoring program in July through team work, root cause analysis, and analysis at the site to resolve the problem<br>1, the next focus should be on how to effectively improve from the tooling tool to quickly and effectively solve the problem.<br>2, need to discuss with AUDIT and the factory quality inspection section how to define the problem of uneven gap between bumpers and headlights.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Summarize audit problems in June, list key control and improvement projects, and form audit score reduction plan in July<br>Pipeline direction, fixed optimization and upgrading, fully allow pipeline battle<br>Optimize the structure of the stair handrail to solve the problem of using the handrail completely<br>Establish improvement plan for design problems, and give priority to taking effective temporary measures to reduce scores.<br>Make improvement plan for 5 major problems in final inspection area<br>Next week, general manager ran and Bai Kefei, Geng Chao and Shen Yanli will go to the final inspection and commissioning area to check the omission of quality problems. The general assembly plant is required to show the measures to improve the commissioning area.<br>Select problems in audit score reduction plan in July, solve problems through team cooperation, root cause analysis and on-site analysis<br>1. The next work should focus on how to effectively improve the tooling fixture to quickly and effectively solve the problem.<br>2. It is necessary to discuss with audit and incoming quality inspection department how to define the uneven gap between bumper and headlamp.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: