每一只孔压计埋设后,应及时采用接收仪器检查孔压计是否正常;如发现异常应查明原因及时修正或补埋。孔压计埋入之前要先测读一下读数,待放入孔中后再的英语翻译

每一只孔压计埋设后,应及时采用接收仪器检查孔压计是否正常;如发现异常应

每一只孔压计埋设后,应及时采用接收仪器检查孔压计是否正常;如发现异常应查明原因及时修正或补埋。孔压计埋入之前要先测读一下读数,待放入孔中后再测读一次读数,等压入孔底后还得再测读一次读数。其中第一次读数(频率值)是与率定频率作对比,以检查孔压计是否正常;第二次测读数测得的是当时的静水压力值,可作为稳定初读数,或与稳定后的压力值对比,确定初读数;第三次读数测得的是孔压计安装的超静孔压。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
After each pore pressure gauge is buried, the receiving instrument should be used to check whether the pore pressure gauge is normal; if an abnormality is found, the cause should be found and corrected or buried in time. <br>Before the piezometer is buried, it is necessary to measure and read the reading. After the piezometer is inserted into the hole, the reading is to be read again. After being pressed into the bottom of the hole, the reading must be read again. Among them, the first reading (frequency value) is compared with the fixed frequency to check whether the pore pressure gauge is normal; the second measurement reading is the static water pressure value at that time, which can be used as a stable initial reading, or after stable The comparison of the pressure values ​​determines the initial reading; the third reading measures the super-static pore pressure installed by the pore pressure gauge.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
After each hole pressure gauge is buried, the receiving instrument shall be used in time to check whether the hole compenduses are normal;<br>Before the hole pressure gauge is buried, read the reading, wait to be put into the hole and then read the reading once, and so pressed into the bottom of the hole, you have to read the reading again. The first reading (frequency value) is compared with the rate-determined frequency to check that the hole pressure gauge is normal, the second reading measures the static water pressure value at that time, which can be used as a stable initial reading, or compared with the stable pressure value, to determine the initial reading, and the third reading measures the super static hole pressure installed by the hole pressure gauge.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
After each pore pressure meter is buried, the receiving instrument shall be used in time to check whether the pore pressure meter is normal; if any abnormality is found, the cause shall be found out and corrected or buried in time.<br>Before burying the pore pressure gauge, first measure and read the reading. After putting it into the hole, measure and read it again. After pressing it into the hole bottom, measure and read it again. The first reading (frequency value) is compared with the calibrated frequency to check whether the pore pressure gauge is normal; the second reading is the hydrostatic pressure value at that time, which can be used as the stable initial reading, or compared with the stable pressure value to determine the initial reading; the third reading is the excess static pore pressure installed by the pore pressure gauge.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.