前翻转盖板与角板surface difference原因1:前围缓冲胶墩未按图纸要求调整到位,导致翻转盖板关闭后与角板面差明显原因2:零部件的英语翻译

前翻转盖板与角板surface difference原因1:前围缓冲胶

前翻转盖板与角板surface difference原因1:前围缓冲胶墩未按图纸要求调整到位,导致翻转盖板关闭后与角板面差明显原因2:零部件自带胶墩尺寸与图纸不符1、零部件针控制胶墩来件尺寸,并要求供应商出厂时对胶墩尺寸做油漆标记。2、总装针对图纸要求的调整尺寸下发OK标准。3、将胶墩尺寸检查前移至生产线。方案1:于5月30日开始执行方案2:于6月3日开始执行方案3:于6月10日开始执行已监督70天无复发
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The surface difference between the front flip cover and the corner plate <br>Reason 1: The front wall buffer rubber pier is not adjusted in place according to the requirements of the drawing, resulting in an obvious difference between the flip cover and the corner plate after the flip cover is closed. <br>Reason 2: The size of the part’s own rubber pier does not match the drawing <br>1 , The component needle controls the size of the rubber pier, and requires the supplier to paint the size of the rubber pier before leaving the factory. <br>2. The final assembly issues OK standards for the adjusted dimensions required by the drawings. <br>3. Move the rubber pier size to the production line before inspection. <br>Plan 1: Started on May 30th <br>Plan 2: Started on June 3rd <br>Plan 3: Started on June 10th and <br>has been supervised for 70 days without recurrence
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Flip the cover front with the corner plate surface difference.<br>Reason 1: The front fence buffer gluon is not adjusted in place according to the requirements of the drawings, resulting in a significant difference with the angle plate after the flip cover is closed.<br>Reason 2: The component's own adhesive size does not match the drawing.<br>1, the component needle control glue to the size of the piece, and require the supplier to the factory to do paint marking on the size of the glue.<br>2, the total assembly for the drawing requirements of the adjustment of the size under the OK standard.<br>3, the size of the glue to the production line before the inspection.<br>Programme 1: Implementation commenced on 30 May.<br>Programme 2: Implementation commenced on 3 June.<br>Programme 3: Implementation commenced on 10 June.<br>No recurrence was supervised for 70 days.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Surface difference between front turnover cover plate and corner plate<br>Reason 1: the front wall buffer rubber pier is not adjusted in place according to the drawing requirements, resulting in obvious difference between the overturned cover plate and the corner plate surface after closing<br>Reason 2: the dimension of the rubber pier attached to the parts does not conform to the drawing<br>1. The parts and components shall control the dimension of the rubber pier, and require the supplier to mark the dimension of the rubber pier with paint when leaving the factory.<br>2. General Assembly issues OK standard according to the adjustment size required by the drawing.<br>3. Move the dimension inspection of rubber pier to the production line.<br>Option 1: to be implemented on 30 May<br>Programme 2: to be implemented on 3 June<br>Programme 3: to be implemented on 10 June<br>There was no recurrence after 70 days of supervision<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: