battens, slip tiles or rib spacers to filler block permanent formwork and sealing open ends of blocks, all cutting, splayed edges and the like, forming grooves, chamfers, ribs and the like including providing battens and boxings, forming mortices and pockets and forming holes for pipes, ducts, cables and the like, adaptation to accommodate projecting pipes, reinforcing bars and the like, access openings and temporary openings, mould oil, release agents and surface retarders, re-using formwork or removing from site formwork not to be re-used. work to sloping surfaces. Bearing Pads day joints (construction joints), contraction joints, expansion joints, isolation joints and joints required in the forming of bays including formwork and treatment of reinforcement crossing the joint, column and wall kickers and construction joints, vapour barrier for slab on grade and slab on fill, all labours on concrete including working around pipes or cables, cutting channels, chases, mortices, pockets and holes and including subsequent grouting or filling and making good. moulds, production, handling, transport and erection, ends, angles, stoolings and the like, fixings, bedding and jointing including movement joints, gaskets, sealants, adhesives and grouts, temporary support. Extra blinding concrete to accommodate level deference in foundation soffit, vapour retarders / polyethylene sheets under slab on grade.