he bridge was in latter stages of construction when on October 29th 2014, a catastrophic fire broke out during welding operations in a tower anchorage area, resulting in a total of nine suspension cables being totally compromised. Once the emergency scene was clear, the engineering response teams immediately ‘unloaded’ the bridge deck and applied temporary tensioning to secure and stabilise the affected structural components.