3. PROGRAM AND EMPHASIS3.1 Special Emphasisa. The podium is in undulating form with architectural rotating fins articulation. The undulating form is different at each levels and form terraces at the façade. Bridge connections to phase 1 existing mall interfacing details between bridges and phase 1 existing façade are required.b. Pre-tender 1:1 visual mock-ups (VMU) for the most typical wall types are required to complete for inspection and approval prior to the actual curtain wall tender. Workmanship mock ups (WMU), other atypical conditions mock ups and performance mock ups are still required in the construction stage.c. BMU (building maintenance unit) is a base scope in this tender. You may select to team up with a sub-consultant under your direct engagement. Detail information of the sub-consultant is still required to submit such as company introduction, team structure, relevant project experiences, etc.d. BIM production is a base scope in this tender. You may select to team up with a sub- contact under your direct engagement. Detail information of the sub-consultant is still required to submit such as company introduction, relevant project experiences, etc.