The CBR shall be such that the laboratory value obtained from testing in accordance with STP 5.1 on samples compacted to the specified dry density and soaked for 4 days shall exceed 25%. In areas where these requirements are not met, correction shall be made by such measures, as the Engineer deems necessary.