According to the site management problems in the construction of water supply and drainage engineering, the quality and specification of the installed pipelines are the top priority. The purchased pipelines must meet the design requirements, and the installation process should also meet the construction standards of water supply and drainage. In addition, the test pressure and medium of the pipeline shall be carried out according to the provisions of the design drawing and the acceptance code. When installing the drainage pipe and rain pipe, the corresponding irrigation test shall be conducted to ensure the smooth drainage. In addition, the installation of pipe supports and hangers shall be constructed in combination with the specific requirements of relevant manuals and construction design. Due to the concealment of most indoor water supply and drainage pipelines, the construction quality management is more strict. Water pressure test must be carried out for concealed water supply pipeline before concealment. Only when the test results meet the design requirements, construction specifications and other relevant standards, can the acceptance procedures be handled. The water supply and drainage system must be cleaned before delivery to ensure the cleanliness of the pipeline
正在翻译中..