根据建筑给排水工程施工中现场管理问题可知,所安装的管道质量与规格是重中之重,采购的管道务必要符合设计要求,安装过程也要符合给排水施工标准。此的英语翻译

根据建筑给排水工程施工中现场管理问题可知,所安装的管道质量与规格是重中

根据建筑给排水工程施工中现场管理问题可知,所安装的管道质量与规格是重中之重,采购的管道务必要符合设计要求,安装过程也要符合给排水施工标准。此外,管道试验压力及介质要按照设计图的规定和验收施规范执行,在安装排水管与雨水管时则要进行相应的灌水试验,以确保其排水顺畅,另外对于管道支吊架安装等要结合相关手册与施工设计具体要求来进行施工。由于室内给排水管道大多具有隐蔽性,使得其施工的质量管理更为严格。给水等隐蔽管道在隐蔽前必须进行水压试验,只有试验结果符合设计要求和施工规范等相关标准后才可办理验收手续。给排水系统在交付使用前必须进行吹洗工作来保证管道清洁度
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
According to on-site management issues in the construction of building water supply and drainage engineering, the quality and specifications of the installed pipes are the top priority. The purchased pipes must meet the design requirements, and the installation process must also meet the water supply and drainage construction standards. In addition, the pipeline test pressure and medium should be carried out in accordance with the regulations of the design drawing and the acceptance specification. When installing the drainage pipe and rainwater pipe, the corresponding irrigation test should be carried out to ensure smooth drainage. In addition, the installation of the pipe support and hanger should be combined Relevant manuals and specific requirements of construction design to carry out construction. Since most of the indoor water supply and drainage pipes are concealed, the quality management of their construction is more stringent. Concealed pipelines such as water supply must undergo a hydraulic test before being concealed. Acceptance procedures can only be processed after the test results meet the design requirements and construction specifications and other relevant standards. The water supply and drainage system must be purged before delivery to ensure the cleanliness of the pipeline
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
According to the construction of the building water supply and drainage project site management problems can be seen, the installation of pipe quality and specifications is the top priority, the procurement of pipes must meet the design requirements, the installation process must also meet the water supply and drainage construction standards. In addition, the pipe test pressure and media in accordance with the provisions of the design plan and acceptance specifications, in the installation of drainage pipe and rainwater pipe to carry out the corresponding irrigation test to ensure that its drainage is smooth, in addition to the installation of pipe support hanger to combine the relevant manualand construction design specific requirements for construction. Because most of the indoor water supply and drainage pipes are hidden, the quality management of its construction is more strict. Hidden pipes such as water supply must be water pressure test before concealment, and the acceptance procedures can only be carried out after the test results meet the relevant standards such as design requirements and construction specifications. The water supply and drainage system must be washed before delivery to ensure pipe cleanliness.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to the site management problems in the construction of water supply and drainage engineering, the quality and specification of the installed pipelines are the top priority. The purchased pipelines must meet the design requirements, and the installation process should also meet the construction standards of water supply and drainage. In addition, the test pressure and medium of the pipeline shall be carried out according to the provisions of the design drawing and the acceptance code. When installing the drainage pipe and rain pipe, the corresponding irrigation test shall be conducted to ensure the smooth drainage. In addition, the installation of pipe supports and hangers shall be constructed in combination with the specific requirements of relevant manuals and construction design. Due to the concealment of most indoor water supply and drainage pipelines, the construction quality management is more strict. Water pressure test must be carried out for concealed water supply pipeline before concealment. Only when the test results meet the design requirements, construction specifications and other relevant standards, can the acceptance procedures be handled. The water supply and drainage system must be cleaned before delivery to ensure the cleanliness of the pipeline
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: