Fill over excavated ground up to the bottom level of capping or sub base with satisfactory soil (Selected Material) conforming to the requirements specified in the technical specification.Capping construciton: Fill over excavated ground up to the bottom level of sub base with satisfactory soil (Selected Material) conforming to the requirements specified in the technical specification.