1. The operation instruction does not clearly define the detailed requirements of the above operations, and the responsibilities of the staff are not clear enough<br>2. The assembly workers of vmf720-b2 production line (including those who cover the wall panel cover) did not conduct self inspection, and those who looked at the appearance of the terminal did not fully inspect and find out, which led to the outflow of defects<br>
正在翻译中..