Plant will be with a maximum active export capacity of the Plant measured at the Electrical Delivery Point at any time, not exceeding 200MWac using an optimally overpowered installed total peak power MWp (to be calculated by the Contractor taking into account optimal utilization of the inverters, parasitic load and losses between the inverters and the Delivery Point).The proposed site for the Plant is in the north of the Al Jouf region of the Kingdom of Saudi Arabia, approximately 10 km to the southeast of Qurrayat town. The size of the available area is approximately 5.9 km².