1. WM asked Berkaert to ensure the condensate tray be connected on gas switch. 2. WM 100% checked the heating exchanger condensate tray before assembly according to WI.3. Based on Damon info, the testing for gas pressure switch signal is complicated, then no this requirement to WM on the end of line testing.