In real-time filling pressure, the method of "thin filling, slow driving, multiple times" should be used, the thickness of the filling area should not exceed 50 cm, and the strong bar area should not exceed 100 cm. After the finish of the mill, apply a manual or bulldozer to pull the surface hair. When the surface of the soil layer is too dry, after the water should be wet, continue to backfill, to ensure that the upper and lower layers combine well.