7. They are set plumb to the depth required on the drawing. Portions of the holes not occupied by markers are backfilled and compacted in layers with suitable material to the level of the original ground. The markers may not be displaced during backfilling. The excavation and backfilling operation, and the backfill material shall be in accordance with ERA standard specification for structures.