"11.1 Packaging Test Report (refer to standard test protocols): Applicable to Finished Goods / Key Modules only11.2 Packaging Work Instructions/Specification: Applicable to sub-components" "12.1 CpK for CTS/CTQ dimensions per the drawing (CTS >=2 min,CTQ>=1.33min),all cavities are required to perform CPK calculation12.2 Process Validation (IQ-OQ-PQ, Line Release process, etc.)" 13.1 Full FAI report per drawing (Include Notes section with or without note #), For assembly and 1 cavity tool: 3 to 5 samples. For multiple cavities tool: 1 sample per cavity 14.1 ISO / UL / CE / etc., marking codes (certificates, required labels and marks on the product and packaging): Applicable for Finished Goods (ODM) and electronic components such as PCB and battery 15.1 Complete Line Readiness Assessment tab 16.1 No of samples requested: Per SQE's need only (example only)