According to actual on-site statistics, during the normal production process, if there are 5 large defective alarms and 10 large defective shutdowns during coating and rolling, such as one roll<br>When the yield is below the alarm line, PQC/PRD needs to notify ME and PE to analyze the defects
正在翻译中..