Since December 21st Mr. After Sacchettini left, the installation company shut down and left on December 26, and the site construction did not progress much. The site presents the new progress as of January 15, 2020 as follows:<br>1, KL710/711 furnace body and process hood installation completed;<br>2, E401/V401 main equipment hoist in place, and this area steel structure to complete most of;<br>3, the production workshop plant completed the side wall panels, curtain doors and upper window installation;<br>4, office building decoration is nearly completed, the first floor with office conditions.