The heating pipe of the magnesium hydroxide tank has been staked out to the tank surface. Since the main pipeline of steam condensation water in the engine room cannot be confirmed, the follow-up tube needs to be staked out on site.
The heating pipes of the magnesium hydroxide tank have been laid out to the tank surface. Due to the inability to confirm the main steam condensate pipeline in the engine room, subsequent pipes need to be laid out on site.
The heating pipe of magnesium hydroxide cabin has been laid out to the cabinet surface. As the main steam condensate pipeline in the engine room cannot be confirmed, the subsequent pipes need to be laid out on site.