Actively implement quota design and improve the design economic responsibility system. The designer should be familiar with mastering the budget quota and cost quota of the construction project, familiar with the budget price of the building materials, and then control the preliminary design and budget according to the project investment estimate, and then use the preliminary design budget to control the construction drawing design and budget. Therefore, under the premise of ensuring functions and technical indicators, all majors must formulate a win-win strategy, reasonably decompose and use investment limits, integrate construction drawing design and construction drawing budget as one, and combine technology and economy organically. Strictly control design changes to ensure that investment limits are not easily breached. The project cost management personnel of a real estate development enterprise shall actively cooperate with the design department to provide reliable engineering basic information in a timely manner. Actively implement quota design and improve the design economic responsibility system. The designer should be familiar with the budget quota and cost quota of construction projects, and the budget price of building materials
正在翻译中..