1.화성Whether the shared new program will cause anomalies such as errors in the mass production model needs to be verified before all the updates can be made- Tianjin B1 Line other models are also in production- Avoid new program problems causing Line Stop of production models2.화성What is shared is only the Dummy program, complete inspection: Dummy program +check project, Tianjin lacks the Dummy check project3. Multi IWT NEO2-2 JIG sent from Korea is suitable for Single and Multi IWT inspection (original Single IWT JIG PCB needs to be removed for reconstruction)-Avoid new JIG production Single IWT JIG cannot be used and needs to be verified- Tianjin has invited to develop and prepare Multi IWT Single IWT each 1ea product, validate the new fixture and program, expected from 11/24 to 11/25- In order to complete the program check from November 24 to November 25, 화성 needs to add the Dummy check item4. Multi IWT existing inspection items