(1) Avoid rough handling at the time of transportation and unloading.
(2) Store in original packed condition.
(3) Check the specifications indicated on the name plate and test certificate attached to the pump and compare with your requirement specifications.
(4) Take care not to damage Circulation Pipe and heat exchanger assembly