刚性屋面混凝土施工气温宜在5℃~35℃时进行,尽量做到随捣随抹,施工完毕要根据气候情况及时覆盖草包,避免暴晒,及时进行浇水养护。的英语翻译

刚性屋面混凝土施工气温宜在5℃~35℃时进行,尽量做到随捣随抹,施工完

刚性屋面混凝土施工气温宜在5℃~35℃时进行,尽量做到随捣随抹,施工完毕要根据气候情况及时覆盖草包,避免暴晒,及时进行浇水养护。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The construction temperature of rigid roof concrete should be carried out at 5℃~35℃. Try to do as much as possible. The straw bales should be covered in time according to the weather conditions after the construction, to avoid exposure to the sun, and watering and curing should be carried out in time.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Rigid roof concrete construction temperature should be carried out at 5 degrees C to 35 degrees C, as far as possible to do with the wipe, construction should be completed according to the weather conditions in a timely manner to cover the grass package, to avoid exposure to the sun, timely watering maintenance.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The temperature of rigid roof concrete construction should be between 5 ℃ and 35 ℃, and it should be tamped and plastered as far as possible. After the construction, straw bags should be covered in time according to the climate conditions to avoid exposure to the sun, and watering and curing should be carried out in time.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: