Rectification welding tooling supplier, i.e. the ignition lock the positioning pin fixture timely correction of the welding position, estimated completion time 2019.12.15
Supplier to carry out welding work modification, i.e. ignition lock welding position positioning pin work assembly to carry out timely correction, estimated completion time 2019.12.15
The supplier shall rectify the welding tooling, i.e. correct the positioning pin tooling at the welding position of ignition lock in time, and the expected completion time is December 15, 2019<br>