Repeat the test according to the wire control pile and leveling base provided by the design. The re-test is also connected to the control pile at the front and back. If the results of the retest do not match the fixed test results provided by the design, you must repeat the test. If you see that the fixed measurement data is incorrect, notify the site of the design unit to retest and verify both parties.