With the large-scale port construction, the breakwater project gradually develops into deep water, but it is becoming more and more difficult to construct because of the adverse conditions such as the large impact of sea wind and waves, poor cover conditions, narrow working surface, and large amount of stone used in the project. Taking a breakwater embankment project in Rizhao Port as an example, according to the project to slope-type breakwater structure as the embankment body, large tank for the structure of the vertical breakwater head section, combined with the natural conditions and construction characteristics of the project, focus on the project embankment head section of the tank transport and installation construction process and key technology innovation optimization, the development of effective measures to guide the practice, To ensure that the progress of the project, construction quality and safety meet the expected requirements and objectives.