The SCH procedure shall follow 6.2.2.3.1.The SC procedure shall follow 6.2. The value “n” for the discharge rate nC shall be based on the rated capacity provided by the supplier and according to the 1 C test results, as described in test procedure 7.1.2.1, respectively. All discharge tests shall be terminated at the supplier's discharge voltage limits. After discharge, the DUT shall rest at least for 30 min or shall be thermally equilibrated at the required ambient temperature or a fixed time period shall be used to allow for thermal equilibration before starting the next step in the test sequence. NOTE The SCH for top-off enables recharging of the DUT in order to compensate for energy losses that can occur during temperature equilibration.