We can’t accept this . All testing we have conducted show our boxes can meet the requirement. So are L&E’s results. The current testing method has been adopted for years by the Labs and it was adopted in this project development process . The A01 report L&E adopted for the sample approval is also by adopting the same standard. We can’t accept that the factory in Indonesia changed the testing method suddenly. If the testing method needs to be changed, we need to be notified in advance or in the project development, so it can be verified and retested before the mass production.