1. Pre-test visual inspection per section 2.6 – 2.9.2. Perform functional test:- Conducting & dielectric strength (open/short/intermittence test)- Insulation resistance per EIA 364-21- Data Synchronization3. Perform SR bending test with 300 g Load, +/- 60 degree bending, 10 cycle/min. 3,000 cycles.4. Perform functional test:- Conducting & dielectric strength (open/short/intermittence test)- Insulation resistance per EIA 364-21- Data Synchronization5. Post-test visual inspection per section 2.6 – 2.9.Acceptance criteria:1. Sample must remain 100% functional.2. Insulation Resistance: 100M min.3. Samples shall show no deformation, structural damage, and/or other anomalies and shall not allow access to internal components.4. No change to normal use.