According to the actual capacity of 20,000 KVA, a 35KV substation (cost about 7 million yuan) needs to be built in the plot, and two switch stations with a capacity of 10,000 KVA (about 2 million yuan each)
According to the actual capacity of 20,000 KVA, 35KV substation (cost about 7 million yuan) will be built in the land, and two switching stations with a capacity of 10,000 KVA (about 2 million yuan each) ...
According to the actual capacity of 20000 KVA, 35kV substation (cost about 7 million yuan) and two switching stations (each about 2 million yuan) with capacity of 10000 KVA shall be built in the plot<br>