ME was evaluated before the next beam, adjusted to the frame front beam assembly plant, regardless of the line assembly and the assembly line, the production conditions can not meet the existing assembly forward. Involved, increasing the transformation of production lines and personnel transport costs. <br>2019.11.14 15:00 will organize special point, to focus discussion on the work,
正在翻译中..